Thomas is a Senior Electrical Engineer with over 10 years in the industry.

Since joining Bryden Wood in 2014 Thomas has been responsible for the electrical design on projects which include a MoD Data Centre, Heathrow Terminal 3 temporary flight control centre, new build education, and the upgrade of the electrical Infrastructure in a fully operational Private Hospital in London.

Thomas was also involved in the design of the electrical systems for a mixed-use residential development, overseeing the project through to Expertise approval.

Thomas is currently leading the MEP design for a new GSK manufacturing facility in Ware, which integrates a MEP plant module solution, using BIM technology.

Accreditations